Repetitions in reserve, usually shortened to RIR, estimates how many more repetitions you could have completed when you stopped a set. “2 RIR” means you think about two additional repetitions were available under the exercise’s agreed standards.

Dumbbells and a bar on a gym equipment rack.

Completed reps and remaining reps are different

If you complete eight repetitions and estimate two RIR, your log should show eight completed repetitions. The two remaining repetitions are an estimate, not work you actually performed. Adding them together and recording ten would change the meaning of the entry.

Field Fictional entry
Exercise The exact movement and variation from the plan
Completed repetitions 8
Estimated RIR 2
Meaning Eight were done; about two more seemed possible

The example explains notation, not a recommended effort level. A target RIR tells you what the plan asks for; an estimated RIR records your judgment about what happened.

How accurate is the estimate?

RIR is a prediction, not a direct measurement. A 2023 study found estimates more accurate nearer failure and in later sets. That does not make an individual estimate exact or prescribe training to failure.

Define what counts as another repetition

For a useful conversation with a coach, clarify the exercise standard. Does “another rep” mean the same range of movement and technique? If the last repetition changed noticeably, record that rather than quietly counting a different movement as equivalent.

You do not have to test the prediction by continuing every set until you cannot do another repetition. “Estimated two, not certain” is an honest note. A log can preserve uncertainty instead of hiding it behind a precise-looking number.

Use the plan’s decision rule

A RIR target by itself does not explain when to change weight or how many sets to perform. Those belong to the wider plan. Read progressive overload for an example of a progression rule, and sets and reps for the basic counts.

If your worksheet uses RPE instead, check our perceived exertion guide. Keep the requested scale, the completed work, and your effort estimate in separate fields.

Is reaching failure required?

Read whether you need to train to failure to build muscle for research findings and examples of recording why a set ended.

A set-by-set note to copy

Use this beside your workout log. Record the target before the set and your estimate afterwards. An unknown estimate is more useful than a number invented to fill the box.

  • Exercise, variation and load, with units:
  • Set number and completed repetitions:
  • Target RIR from the plan, if given:
  • Estimated RIR and how certain you feel:
  • Reason for stopping; technique or range-of-motion changes:
  • Rest and setup notes relevant to comparison:

Example: target and estimate do not match

Fictional entry: set 1, eight completed repetitions, target 2 RIR, estimated 1 RIR, uncertain. Keep eight as the completed count and preserve both effort numbers. The difference does not prove that you lost strength or that the load must change immediately.

Before the next session, compare the same exercise, load units, setup, range of motion and rest. Follow the plan’s adjustment rule, or ask the person who wrote it. A single estimate cannot identify the cause of a difficult day. See the beginner strength learning path for how these pieces fit together.

Evidence correction

An earlier version cited a paper that was retracted. That claim has been removed and the accuracy section now cites different research.